Projects

Isolation Valves

Project Scope: Install double-block and bleed manual valves to isolate Coker gas oil filter pots. Services Provided: Mechanical engineering Project scope development Project management Equipment drawing and spec. sheet development Equipment bidding and procurement Documentation and operator training Management of change / process hazard analysis Field support Quick Contact Tell us a little about your […]

Isolation Valves Read More »

Wastewater Treatment MOSC Tank Platform

Project Scope: Install an access platform and tank gauging equipment for waste oil / sludge tank. Services Provided: Oversight of structural engineering Project scope development Project management Structural drawing development Equipment bidding and procurement Management of change / process hazard analysis Field support Quick Contact Tell us a little about your project needs and we’ll

Wastewater Treatment MOSC Tank Platform Read More »

Lime Kiln

Project Scope: New bunker, kiln, milk of lime plant Services Provided: Mechanical design Civil design Structural design Construction management Quick Contact Tell us a little about your project needs and we’ll get back to you ASAP.  Name First Last Phone Email Comment CAPTCHA We respect your privacy and do not tolerate spam and will never sell,

Lime Kiln Read More »

Seed Scalper

Project Scope: Install new bucket elevator, seed scalper-aspirator and clean seed collection screw to improve seed cleaning plant. Services Provided: Mechanical design Structural design Construction management Quick Contact Tell us a little about your project needs and we’ll get back to you ASAP.  Name First Last Phone Email Comment CAPTCHA We respect your privacy and do

Seed Scalper Read More »

#7 White Centrifugal Addition

Project Scope: Install new Broadbent C32MT Batch Centrifugal, mini-Mingler, discharge screw conveyor, piping & structure required for operations & maintenance access. Services Provided: Structural engineering Mechanical engineering Construction documentation Equipment procurement documentation Construction management Start-up assistance Quick Contact Tell us a little about your project needs and we’ll get back to you ASAP.  Name First

#7 White Centrifugal Addition Read More »

Pellet Loadout

Project Scope: Increase the pellet railcar loading rate to reduce manpower requirements from three (3) shifts down to one (1) day shift.  This was done by installing a bulk weighing system, bucket elevator, belt conveyors, metering screw conveyors & slide gates to meet the required flow capacity.  Also, included were modifications to the existing dust

Pellet Loadout Read More »

Spray Table

Project Scope: Install new Putsch Roller Spray Table to wash beets and reduce sugar losses.  Work included installation of spray water booster pumps, filter/strainers, feed & discharge chutes, and maintenance access platforms. Services Provided: Structural engineering Mechanical engineering Construction documentation Equipment procurement documentation Construction management Start-up assistance Quick Contact Tell us a little about your

Spray Table Read More »

#3 Beet Slicer

Project Scope: Install an additional Putsch Beet Slicer, the slicer feed hopper, a 3-hopper diverter system, hydraulic back hoe for handling frozen beets, Redesign & fabrication drawings for slicer hydraulic pokers for frozen beets at inlet to slicer, design & fabrication drawing for motor support with gravity take-up, lengthening & changing angle of an existing

#3 Beet Slicer Read More »

Pulp Press Addition

Project Scope: Install a new Putsch twin spindle pulp press with Keller gearbox, feed chute, discharge screw conveyor, maintenance lifting beams, gearbox lubrication system, ventilation system, & necessary piping & structural changes for installation into an existing building. Services Provided: Structural engineering Mechanical engineering Construction documentation Equipment procurement documentation Construction management Start-up assistance Quick Contact

Pulp Press Addition Read More »

Concentrator Replacement

Project Scope: Remove dual in-vessel plate and frame evaps and carbon steel flash vessel. Replace with new external P&F evap and SS flash tank. Services Provided: Mechanical design Structural design Construction management Quick Contact Tell us a little about your project needs and we’ll get back to you ASAP.  Name First Last Phone Email Comment

Concentrator Replacement Read More »

Scroll to Top